Power Booster Assembly Installation - Daewoo Nubira Owner's Manual

1998-2001 nubira
Hide thumbs Also See for Nubira:
Table of Contents

Advertisement

DAEWOO V–121 BL4
POWER BOOSTER 4C – 5
Installation Procedure
1.
Check the pushrod and the pushrod clevis for dam-
age and proper fit.
2.
Install the hex nut and the pushrod clevis on the
booster shaft.
Tighten
Tighten the booster hex nut and the pushrod clevis to
18 NSm (13 lb–ft).
3.
Measure the distance from the booster to the cen-
ter of the clevis bore.
Important : This measurement should be 203 mm (8 inch-
es).
4.
Install the rubber boot on the booster.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents