Servicing And Maintenance Logs - Buderus Logano plus GB312 Installation And Service Instructions Manual

Gas condensing boiler
Table of Contents

Advertisement

9.11

Servicing and maintenance logs

The inspection and maintenance logs can also be used as templates.
▶ Sign and date the completed inspection work.
Service work
1.
Check general condition of heating system (visual inspection and
function check)
2.
Checking the gas and water-bearing system components for:
internal leaks
Visible signs of corrosion
signs of ageing
3.
Check concentration of additives in heating water
( see additive manufacturer's documentation and "Water quality
4.
Checking the heating system operating pressure
5.
Check air intake and outlet openings and flue connector
6.
Record readings taken:
Pressure differential
Aggregate flue gas temperature t
CO
2 level or oxygen content
Determine extent of contamination:
Clean the burner and heat exchanger as necessary
CO content, free of air
7.
Carry out function checks:
Check ionization current
8.
Checking for leaks during operation
9.
Check that the controller settings are as required ( technical
documentation for controller)
10.
Final check of servicing work
Confirmation of properly completed servicing
Company stamp/Date/Signature
Table 20 Servicing and maintenance logs
Logano plus GB312 – 6 720 806 273 (2013/01)
A
(O
)
2
If any condition requiring maintenance work is identified
in the course of inspection, that work must be carried out
as required.
Page
Maximum load
Minimum load
-
-
-
41
32
36
____in W.C.
____in W.C.
________ °F
________ °F
________ %
________ %
______ ppm
______ ppm
37
________ μA
________ μA
38
Heating system inspection
Maximum load
Minimum load
____in W.C.
____in W.C.
________ °F
________ °F
________ %
________ %
_____ ppm
______ ppm
________ μA
________ μA
9
49

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents