(1) Grounding
A qualified electrician should perform the grounding work for the following 3 points. (Ground Resistance
less than 500 )
●The ELCB grounding terminal
●The bonnet grounding terminal
●The load bonnet terminal
C aution
<
<
>
>
<
<
>
>
●In the event you cannot ground, consult with our
authorized distributor or our service section.
(2) Operation Check
1. Turn a tarter switch from
2. Set the breaker lever to
3. Push a test button in the breaker.
(The device is normal when ELCB Lamp (Red) turns ON and the lever positions at the middle of
O N
a nd
『
』
4. Push the reset button.
(The ELCB lamp (red) turns OFF)
5. Push down the breaker lever
6. Proceed with engine start procedure once returning a starter switch to
In the event you cannot complete all steps as above, the device is out of order. Consult with our
authorized distributor or our service section.
S TOP
t o
R UN
『
』
『
O N
.
『
』
O FF
) .
『
』
O FF
.
『
』
Bonnet Grounding terminal
.
』
ELCB Lamp
Reset Button
14
ELCB Grounding terminal
Earth lod
S TOP
.
『
』
Test Button