Changing A Mailbox Node - Nortel CallPilot 150 Administration Manual

Hide thumbs Also See for CallPilot 150:
Table of Contents

Advertisement

80
Chapter 7 Working with CCR Trees

Changing a Mailbox node

To change a Mailbox node
Log:
QUIT
RETRY
Admin
MBOX
AA
Admin
GLIST
CCR
CCR Admin
ADMIN
CCR tree:
RETRY
Tree: x
CHNG
Path:
RETRY
END
x
CHNG
ERASE
Mbox: xx
CHNG
Mbox:
DIR
Dest: <xxxx>
CHNG
Path:
RETRY
END
Tree: x
SAVE
PRINT
Save as tree x
YES
OTHR
Tree saved
CCR Admin
ADMIN
P0919416 03
Press ≤·°‹.
1
OK
Enter the System Administrator Mailbox number and password,
and then press OK.
2
Press OTHR.
OTHR
3
Press CCR.
4
Press ADMIN.
5
Enter the number of the CCR Tree that you want to change and press
OK
OK.
6
Press CHNG.
QUIT
7
Enter the Path of the node you want to change and press OK.
OK
LvMsg
8
Press CHNG.
OK
9
Press CHNG.
NEXT
10 Enter the new mailbox number.
QUIT
Make sure the mailbox is initialized before you assign it to a CCR
Tree.
11 Press OK if you want to accept the assigned destination type
OK
or
press CHNG and assign a new destination type.
12 Press END.
OK
13 Press SAVE.
QUIT
14 Press YES.
QUIT
15 This display appears briefly.
16 Press ® to end the session.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

150

Table of Contents