Connecting the media gateway to the main distribution frame
Figure 58: Cable routing to bottom terminal blocks
Figure notes
1
Main Distribution Frame
2
AC Power Cord (AC-powered media
gateways only)
3
Cable Slack Manager Number 1
4
Trunk/Auxiliary Field
5
Station Distribution Field
Use these guidelines when routing cables from the media gateway to the MDF. Following these
guidelines will maximize use of the cable slack managers and make future cabling additions and changes
easier.
Connect each port cable at the media gateway, and then route it along the front trough of the cable
slack manager to the connecting/terminal block, where the cable is terminated.
Leave enough slack at the media gateway end of the cable to allow for proper dressing of the
cables.
Route the cable from the media gateway to the wall. Place the cable beside one of the rows of
columns in the cable slack manager.
NOTE:
Retainers mounted on the columns keep the cable from protruding above the top of the
base of the cable slack manager.
Determine the length of the cable required to reach from the cable slack manager to the assigned
connecting/terminal block.
Use D rings on the wall to support the cable. (The cable must be supported.)
Coil the cable around the columns in the cable slack manager to store cable slack. The first run
should always go across the full length of the 5 columns in the cable slack manager.
120
r758432b MMR 052996
6
Cable Slack Manager Number 2
7
Cable Slack Manager Number 3
8
Media Gateway(s)
9
Building Cables (through cable
trough)
10
10 AWG (#25) (6 square millimeters)
Wire to Coupled Bonding Conductor