To install cable slack managers:
1
Place the Z113A Cable Slack Manager against the wall under the MDF. See
routing through Cable Slack Manager—example for SCC1 Media Gateway,
the left side of the cable slack manager with the first terminal block of the trunk/auxiliary field.
2
Place the next cable slack manager beside the previously installed unit. Align the tabs and
interlocks and snap the units together.
3
Repeat Step 2 until all cable slack managers are installed.
4
An example of how the media gateway cables route through the cable slack manager is shown in
Figure 53, Cable routing through Cable Slack Manager—example for MCC1 Media Gateway,
page 114.
Cable clamps are required in installations with cable slack managers. At the rear of the media gateways,
install two cable clamps using the screws provided. These clamps hold the 25-pair input/output or MDF
cables in place.
Gateway,
on page 114 and
Media Gateway,
Figure 53: Cable routing through Cable Slack Manager—example for MCC1 Media
Gateway
Figure notes
1
Top of Media Gateway
2
Cable Slack Manager
3
Cable Clamp
114
NOTE:
Nine 1/4-inch (0.63 centimeter) holes are provided in a cable slack manager base if
earthquake mounting is required. If a base is mounted on an uneven floor, shims may be
required for leveling and to assure proper fit of the covers.
Holes are provided in the sides of the base for bolting cable slack manager together.
Obtain bolts and shims locally.
Figure 53, Cable routing through Cable Slack Manager—example for MCC1 Media
Figure 54, Cable routing through Cable Slack Manager—example for SCC1
on page 115 show cable clamp placement and cable routing.
4
Spare Center Troughs
5
Media Gateway Trough for Port
Cables
Installing the Avaya G650 Media Gateway
Figure 54, Cable
on page 115. Align
on
cbdfflr CJL 102396
June 2004