Avaya G650 Installing page 110

Avaya media gateway
Hide thumbs Also See for G650:
Table of Contents

Advertisement

2
If you are installing 300-pair terminal blocks, draw a level horizontal line on the wall 47.5 inches
(1.2 meters) above the floor. See
If you are installing 900-pair terminal blocks, draw a level horizontal line on the wall 23 inches
(58.4 cm) above the floor. See
3
To mount the first trunk/auxiliary field terminal block, partially install 2 3/4-inch, #12 wood
screws, 7-11/1- inch (19.5-centimeter) apart on the left side of the horizontal line on the wall.
4
Slide the bottom terminal block ft onto the mounting screws and mark the upper mounting screw
locations.
5
Remove the terminal block and partially install the upper mounting screws.
6
Place the terminal block on the mounting screws and tighten the screws.
7
If installing a vertical patch cord trough, partially install the first screw for the patch cord trough,
on the line, 7/8-inch (2.2-centimeter) to the right of the previous screw. Partially install the second
mounting screw 5.31 inch (13.5 centimeter) to the right of the screw just installed. Repeat Steps 4,
5, and 6.
8
If another trunk/auxiliary field terminal block is to be installed, partially install the first screw for
the terminal block, on the line, 7/8-inch (2.2-centimeter) to the right of the previous screw.
Partially install the second mounting screw 7-11/1- inch (19.5-centimeter) to the right of the
screw just installed. Repeat Steps 4, 5, and 6.
9
If a horizontal patch cord trough is to be installed, install it, on the line, between the
trunk/auxiliary field and the distribution field.
10
To install the first distribution field terminal block, partially install 2 3/4-inch, #12 wood screws,
7-11/16 inch (19.5 centimeter) apart on the line, to the right of the vertical patch cord trough.
Repeat Steps 4, 5, and 6.
11
If installing another distribution field terminal block, partially install the first screw for the
terminal block, on the line, 7/8-inch (2.2 centimeter) to the right of the previous screw. Partially
install the second mounting screw 7-11/16 inch (19.5 centimeter) to right of the screw just
installed. Repeat Steps 4, 5, and 6.
12
If installing a vertical patch cord trough in the distribution field, repeat Step 6.
13
Repeat Steps 11 and 12 until all the terminal blocks and vertical patch cord troughs in the
distribution field are installed.
110
Figure 50, 110A-type terminal blocks (300-pair),
Figure 51, 110P-type terminal blocks (900-pair),
Installing the Avaya G650 Media Gateway
on page 111.
on page 112.
June 2004

Advertisement

Table of Contents
loading

Table of Contents