Removing And Replacing A Dual-Core Processor; Processor Load Order - HP Integrity rx6600 User's & Service Manual

Hp integrity server
Hide thumbs Also See for Integrity rx6600:
Table of Contents

Advertisement

Removing and Replacing a Dual-Core Processor

The HP Integrity rx6600 uses dual-core processors. That is, each processor contains two cores that
function as separate processors. Dual-core processors double the processing power of the server
while maintaining the physical dimensions of a single processor.
The server can contain one, two, three, or four dual-core processors that provide the following
configuration options:
1P/2C (One processor/two cores)
2P/4C (Two processors/four cores)
3P/6C (Three processors/six cores)
4P/8C (Four processors/eight cores)
If the server has fewer than the maximum number of dual-core processors installed, install the
additional processors in the appropriate slot.
WARNING!
from the server prior to performing this procedure.
Voltages are present at various locations within the server whenever an AC power source is
connected. This voltage is present even when the main power switch is in the off position.
Failure to observe this warning can result in personal injury or damage to equipment.
CAUTION:
to observe this caution results in performance degradation or system failure.
The easiest way to ensure compatibility is to use dual-core processors with identical part numbers.
CAUTION:
ESD safety precautions can result in damage to the server.

Processor Load Order

You can install up to four dual-core processors on the processor board. If fewer than the maximum
number of dual-core processors are installed (one, two, or three in the HP Integrity rx6600 server),
install them in the designated locations on the processor board.
The slots on the processor board are labeled Module 0, Module 1, Module 2, and Module 3. The
Module 0 and Module 1 slots are located on the top of the processor board assembly, and the
Module 2 and Module 3 slots are located on the underside of the processor board assembly.
IMPORTANT:
servicing the Module 2 or Module 3 slots.
Install the first processor in the Module 0 slot. Install the second dual-core processor in the Module
1 socket, and so on. The load sequence is described in
Table 75 Processor Load Order
Dual-Core Processor
216
Removing and Replacing Server Components
Ensure that the system is powered off and all power sources have been disconnected
Ensure that processor speed and cache size are identical for all processors. Failure
Observe all ESD safety precautions before attempting this procedure. Failure to follow
Use the supplied handholds to turn the processor board assembly over if you are
1
2
3
4
Table
75.
Slot
Module 0
Module 1
Module 2
Module 3

Advertisement

Table of Contents
loading

Table of Contents