Sennheiser SKM 9000 Instruction Manual page 31

Digital 9000 system instruction for use
Hide thumbs Also See for SKM 9000:
Table of Contents

Advertisement

Preparing the Digital 9000 system for use
30 |
Digital 9000
Connect the
RF OUT
N-type sockets of the first receiver to the
N-type sockets of an additional receiver. To do so, use the RF patch
cables from the EM 9046 CAB cable set.
EM9046
ANT A
ANT B
RF OUT B
RF OUT A
Repeat the previous steps for up to four receivers.
The length of the RF patch cables from the EM 9046 CAB cable set
allows a distance of 1 height unit (HU) between two EM 9046 in
a 19" rack.
If you want to pass on word clock signals between daisy chained receivers
and/or if you want to connect daisy chained receivers in a network
(see the following chapters):
Connect the receivers in the same order in which you connected the
N-type sockets. Always connect the network sockets from
LAN
UP.
ANT B
ANT A
RF IN B
RF IN A
RF OUT B
RF OUT A
RF IN B
RF IN A
RF OUT B
RF OUT A
RF IN B
RF IN A
RF OUT B
RF OUT A
Master
PC (WSM)
WORD
CLOCK
IN
OUT
WORD
CLOCK
IN
OUT
WORD
CLOCK
IN
OUT
RF IN
RF
LAN DOWN
to
LAN UP
LAN DOWN
LAN UP
LAN DOWN
LAN UP
LAN DOWN

Advertisement

Table of Contents
loading

Table of Contents