Preparing to Install the BBU
Battery-to-Router Connector
The first BBU installed features a single battery-to-router connector at the base, which connects to the
BBU cable inside the router (shown in
Figure 12-4
Locating Pin and Notch
When you connect a second or third battery to a battery already installed in the router, use the locating
pin and notch to ensure correct battery position and align the battery connectors.
Cisco 1240 Connected Grid Router Hardware Installation Guide
12-8
Figure
Battery-to-Router Connector
Chapter 12
12-6).
Installing Battery Backup Units
OL-26223-04