Preparing to Install the BBU
Battery-to-Battery Connectors
Figure 12-2
Item
1
2
3
Cisco 1240 Connected Grid Router Hardware Installation Guide
12-6
Front of Battery Backup Unit
1
Description
Captive screws (6) for installing the BBU directly to the router door or to another
BBU already installed on the router door.
Battery-to-battery connector, female. The BBU features two battery-to-battery
connectors: one male and one female, which are used to connect batteries together
when two or more batteries are installed in one router.
Threaded insert used to attach an additional BBU (6)
Chapter 12
2
3
Installing Battery Backup Units
OL-26223-04