Power On; Installation Check - Mitsubishi FR-F500 Instruction Manual

Transistorized inverter
Hide thumbs Also See for FR-F500:
Table of Contents

Advertisement

3.1.2 Power on

Before switching power on, check the following:

Installation check

Make sure that the inverter is installed correctly in a proper location. (Refer to page 7.)
Wiring check
Make sure that the main and control circuits are wired correctly.
Make sure that the options and peripheral devices are selected and connected correctly.
(Refer to page 9.)
Switch power on.
Power-on is complete when the POWER lamp is lit correctly and the operation panel (FR-DU04) displays
correct data.
OPERATION/CONTROL
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents