Management Actions
............................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................
While on the Secondary, select the
11
........................................................................................................................................................................................................................
Click the
12
........................................................................................................................................................................................................................
Enable replication on the new Primary.
13
a. Click the
b. Click the
c. Check the
d. Click the
........................................................................................................................................................................................................................
While on the Primary, select the
14
........................................................................................................................................................................................................................
Click the
15
Connected
........................................................................................................................................................................................................................
After a few minutes (dependant on database size), the Primary Queued list will change to
16
and the system will be ready for use.
Done
E
O
N D
........................................................................................................................................................
To restore after replacement of the Secondary server
This procedure assumes that a stacked system has been in operation for a while, and
regularly scheduled backups have been made.
There are three procedures that must be performed:
Initial installation of the Secondary
•
Restoration of the configuration settings on the Secondary
•
Replication of the database from the Primary to the Secondary
•
............................................................................................................................................................................................................................................................
3 - 1 4
item and wait for messages to be queued.
Data Replication
Configuration
Database Replication
Enable Replication
button.
Save
item and wait for both Primary and Secondary to be in the
Data Replication
state.
S
F
T E P S
To restore after replacement of the Secondary server
tab.
Monitoring
tab.
item.
box.
tab.
Monitoring
8AL90208USAD ed01
November 20, 2008