The Westminster Front - FPI P36D-NG Owners & Installation Manual

P36d zero clearance direct vent gas fireplace
Table of Contents

Advertisement

PALACE SERIES OPTIONS
THE WESTMINSTER FRONT INSTALLATION
1) Install the hood to the Westminster Front by sliding the 4 cut-outs thru
the screws and tighten to secure.
Westminster Front
2) Bend tabs located at the back of the Westminster Front upwards 90
degrees.
Backside of front shown.
3) Secure the bottom frame of the Front by loosening the inner screw
on the hinge brackets on both the left and right side of the firebox.
Slide frame in place and secure.
Hinge bracket on
bottom of firebox
Westminster Front
frame
58
Cut-out in Hood
Bend
tab
upwards 90
degrees.
Left Side Shown
4) Slide tabs into louver brackets located on the inside top of the firebox.
Bracket inside
top of firebox.
5) Remove existing control switch box from under firebox by discon-
necting wires connected to the valve at TH-TH/TP terminals and
discard.
Control Box
6) Connect the ON/OFF switch wires coming from the left side of the
Front to the valve, with black hooked up to the TH/TP terminal and red
hooked up to the TH terminal.
NOTE: If fan option is not used please see step (5) of optional fan
installation for placement of fan control box.
Fan Control Box
ON/OFF Switch Wires
7) For optional fan installation, see page 60.
8) For 2-panel & 3-panel door installation, see page 61.
FPI P36D Zero Clearance Direct Vent Gas Fireplace
Tabs
Wires connected to Valve.
Valve

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P36d-lp

Table of Contents