Vertical Terminations - FPI P36D-NG Owners & Installation Manual

P36d zero clearance direct vent gas fireplace
Table of Contents

Advertisement

VENTING ARRANGEMENTS - VERTICAL TERMINATIONS
The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations , using two 90
rigid pipe vent systems for Propane and Natural Gas.
Vent must be supported at offsets.
Firestops are required at each floor level and whenever passing through a wall.
Maintain clearances to combustibles.
Note: Must use optional rigid pipe adaptor when using rigid pipe vent systems (Part # 510-994).
FPI P36D Zero Clearance Direct Vent Gas Fireplace
RIGID PIPE SYSTEM
(Propane & Natural Gas)
INSTALLATION
o
elbow, with
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P36d-lp

Table of Contents