FPI P36D-NG Owners & Installation Manual page 52

P36d zero clearance direct vent gas fireplace
Table of Contents

Advertisement

REGENCY OPTIONS
6) Install Top Support Frame
Slide in the Top Support Frame
using the slots as a guide. Secure and re-tighten the screws to the
unit.
a) View of backside of Top Support Frame.
b)
7) Side Support Frame
a) Mount Side Support Frame to unit as shown in diagram, then
secure with 2 screws on each side.
b) Repeat step on the other side.
52
Cut-Outs
8) Attach Top and Side Support Frame
a) Ensure the Side Supports are aligned with the corresponding hole
on the Top Support Frame, then secure with 1 screw.
b) Repeat step on the other side.
Note: The Nailing Strips can be adjusted, depending on the facing
material (as indicated in Diagram 2).
1/2" Facing
Material
1" Facing
Material
Diagram 2
9) Optional
Install Optional 3-Panel Arch Door. (Refer to Install 3-Panel Arch
Door Instruction Sheet).
10) Change in Logo
Replace existing logo with Regency logo.
FPI P36D Zero Clearance Direct Vent Gas Fireplace

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P36d-lp

Table of Contents