Line Status Test - AT&T Call Management System Installation And Programming Manual

For merlin legend communications system
Hide thumbs Also See for Call Management System:
Table of Contents

Advertisement

Testing CMS

Line Status Test

The Line Status Test verifies that the lines assigned to CMS are correctly
identified and programmed. It compares the CMS supervisor console with
the CMS PC Line Status screen to confirm that they are the same.
IMPORTANT:
Line assignments to both extension numbers assigned to the CMS PC
(CU1 and CU2) must be identical.
IMPORTANT:
If you are not familiar with MERLIN LEGEND system programming, get
help with this test from someone who is.
Perform this test at the CMS supervisor telephone (a MERLIN LEGEND Sys-
tem Display Console). Have available the CMS Line Button Planning Form,
and MERLIN LEGEND Forms 2a and 2c. If the CMS supervisor phone is
located so that you can't read the PC screen, you'll need another person to
help with this test.
To perform the Line Status Test:
1. At the Initialization screen, press [F3] (System Status).
The System Status screen appears.
2. Press [F5] (Line Status).
The Line Status screen appears.
3. At the CMS supervisor telephone:
a. Press the phone's Speaker button (or lift the handset).
b. Press the line button for the line shown on Button 1 on the Line
Button Planning Form while watching the Line Status screen on
the CMS PC.
When you press the line button, the line's status, as shown on the Line
Status screen, changes from Idle to Cnct (connected).
Line Status Test
7-3

Advertisement

Table of Contents
loading

Table of Contents