This chapter describes how to install the ENH200. It also describes the ENH200 LEDs. 
 
Only experienced installation professionals who are familiar with local building and safety 
codes and, wherever applicable, are licensed by the appropriate government regulatory authorities 
should install the ENH200.   
 
3.1 Pre‐installation Guidelines 
 
Select the optimal locations for the equipment using the following guidelines: 
T
he ENH200 should be mounted on a 1"‐4" pole. Its location should enable easy access to the 
-
unit and its connectors for installation and testing. 
The higher the placement of the antenna, the better the achievable link quality. 
-
The antenna should be installed to provide a direct, or near line of sight with the Base Station 
-
antenna. The antenna should be aligned to face the general direction of the Base Station. 
 
3.2 Installing the ENH200 
To install the ENH200, use the following procedure to mount the device on a pole and refer to the 
figure below. 
1. The bottom of the ENH200 is a movable cover. Grab the cover and pull it back hard to 
remove the cover. 
2. Insert a standard Ethernet cable into the RJ‐45 port labeled MAIN LAN. 
3. Slide the cover back to seal the bottom of the ENH200. 
4. Remove the power cord and PoE injector from the box and plug the power cord into the 
DC port of the PoE injector. 
  Only use the power adapter supplied with the ENH200. Using a different power adapter 
might damage the ENH200. 
5. Plug the other side of the Ethernet cable in step 3 into the PoE port of the PoE injector. 
When you finish step 5, the installation will resemble the following picture. 