Creating a New PLC
54
13. Exit the Serial communications window
Repeat the operation from 10 to 12 as required. After completing all settings,
click [Next(N)>] button to display the [Contents List] window.
• Contents
14. Pressing the [Complete] button after confirming the contents of the [PLC
Setup] wizard will exit the [PLC Setup] wizard. Then the Ladder Engine is
started and each window for Work CX-Simulator, CX-Simulator Debug
Console, and Status will be displayed.
The Work CX-Simulator window
The CX-Simulator Debug Console
window
The Status window
Refer to the following items for the contents of each window.
Work CX-Simulator window
The CX-Simulator Debug Console
window
The Status window
The Ladder Engine of the Simulator
will be connected to the
CX-Programmer.
Execute operation for the Ladder
Engine.
Display the status of the Ladder En-
gine and set for the Ladder Engine.
3-8 Connecting to the
CX-Programmer Version 2.1 or Lower
3-6 Each Part of the Windows
3-6 Each Part of the Windows
Section 3-5