Basic hardware procedures
Additionally, a lifter is required in the following cases:
– The server weighs more than 50 kg.
– The server weighs more than 21 kg and is to be removed above the height
of 25 U.
When using a lifter, this removal procedure needs to be carried out by
maintenance personnel.
Figure 4: Removing the server from the rack
50
For configurations above 55 kg:
At least four people are needed to lift the server out of
the rack cabinet.
Upgrade and Maintenance Manual
RX4770 M5