Expansion cards and backup units
Concluding steps
▶
"Installing the FBU carrier" on page
▶ Connect the FBU adapter cable to the TFM, see
on page
222.
▶ Install the air duct on the top system board, see
on page 74
▶
"Installing the fan cage" on page
▶
"Reassembling" on page
▶
"Connecting the power cord (AC PSU)" on page
▶
"Switching on the server" on page
▶
"Updating expansion card firmware" on page
The recalibration of the FBU starts automatically, and finishes within a
few minutes.
238
231.
71.
53.
59.
Upgrade and Maintenance Manual
"Installing the new TFM"
"Installing the CPU air duct"
58.
93.
RX4770 M5