4.18 Reactor

4.18.1 Checking procedures

To perform an electrical check of the reactor
RXTM-R+RXTP-R+ARXTP-R+RXTA-B+FTXTA30B2V1B(W)
(B)+FTXTM30+40R2V1B+FTXTP25+35M5V1B+ATXTP25+35M5V1B
R32 Optimized Heating 4 Split
ESIE21-12A – 2022.02
a Backside of the front panel
b Fixing tab
c Support
3 Close the front panel.
4 Gently press the front panel down until it clicks.
FTXTM-R, FTXTP-M and ATXTP-M units
1 Set the filters as they were.
2 Gently press the front panel at both sides and at the center until it clicks.
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
1 Remove the required plate work, see
DANGER: RISK OF ELECTROCUTION
Wait for at least 10 minutes after the circuit breaker has been turned OFF, to be sure
the rectifier voltage is below 10 V DC before proceeding.
2 Visually check the reactor for any damage or burnt‑out components. If any
damage is found, replace the reactor, see
3 Check that the reactors are firmly installed on the main PCB.
4
|
a
b
c
4
"4.17 Plate
work" [
 144].
"4.18.2 Repair
procedures" [
Components
4
 167].
Service manual
165