Reactor; Checking Procedures - Daikin Sensira RXQ25AMV1B Service Manual

Split r32 bbop
Hide thumbs Also See for Sensira RXQ25AMV1B:
Table of Contents

Advertisement

3
|
Components
To re-install the front grille
To re-install the front panel

3.11 Reactor

3.11.1 Checking procedures

To perform an electrical check of the reactor
Service manual
104
a Power supply terminal X1M
b Power supply wiring bracket
c Screw (ground wire)
d Heat exchanger thermistor
e Indoor unit main PCB
f Switch box screw
g Switch box
2 Route the connectors of the indoor unit fan motor and swing flap motor inside
the switch box and connect them to the indoor unit main PCB.
3 Install and tighten the screw to secure the switch box.
4 Install the heat exchanger thermistor in its holder.
5 Connect the grounding wire to the heat exchanger using the screw.
6 Connect the power supply wiring to the power supply terminal X1M.
7 Install the power supply wiring bracket. Install and tighten the screw.
1 Install the front grille and firmly engage the 3 upper hooks.
2 Install 2 screws back on the front grille.
3 Install the air filter and then mount the front panel.
1 Attach the front panel. Align the shafts with the slots and push them all the
way in.
2 Close the front panel, see
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
1 Remove the required plate work, see
c
a
d
f
b
"3.10 Plate
work" [
"3.10 Plate
RXQ25+35AMV1B + ARXQ25+35AMV1B + FTXQ25+35AMV1B +
e
g
4
 94].
4
work" [
 94].
ATXQ25+35AMV1B