Installing the MGX 8830 or MGX 8830/B Switch
Table 5-7
Installation Checklist—MGX 8830 System (continued)
Rack-Mounted System
Check Steps
(Without Lift)
Step 5
Install the AC Power Supply Tray
Remove the AC Power Supplies from the AC Power Supply Tray
•
Install the AC Power Supply Tray(s)
•
Reinstall the AC Power Supplies
•
Step 6
Install the Cisco MGX 8850
Switch without a Mechanical Lift
Prepare for Installation
•
Remove the Front Cards
•
Remove the Back Cards
•
•
Remove the Back Cards from
an APS Assembly
Remove the DC PEM(s)
•
Install the Switch in the Rack
•
or Cabinet
Reinstall the APS Assembly
•
Reinstall the Back Cards
•
Reinstall the DC PEM(s)
•
•
Reinstall the Front Cards
Step 7
Install the Cable Management Assembly
Step 8
Connect the AC Power Supply Tray to the Cisco MGX 8830 Switch
Step 9
Connect the Back Cards
Step 10
Connect the Console Port
Step 11
Connect Power to the Cisco MGX 8830 Switch
Connect AC Power to the Switch
•
Connect DC Power to the Switch
•
Step 12
Connect the External Clock (optional)
•
Step 13
Connect the Alarms
•
Step 14
Connect the MP Connection
•
Step 15
Connect the LAN1/2 Ports
•
Step 16
Verify EMI Compliance
•
After completing these steps, proceed to the
Note
section on page 5-137
Cisco MGX 8800/8900 Series Hardware Installation Guide
5-100
Rack-Mounted System (with Lift)
Install the Cisco MGX 8850
Switch with a Mechanical Lift
Install the Switch in a 19-Inch
•
or 23-Inch Rack
Install the Switch in a 19-Inch
•
Cabinet
"First Time Power On Procedure for MGX Switches"
if this is a first-time installation.
Chapter 5
Installing the Cisco MGX Switch or Gateway
Cisco Cabinet System
Connect the Console Port
Connect Power to the Cisco MGX
8830 Switch
Connect AC Power to the
•
Switch
Connect DC Power to the
•
Switch
Connect the External Clock
(optional)
Connect the Alarms
Connect the MP Connection
Connect the LAN1/2 Ports
Verify EMI Compliance
Releases 2 - 5.2, Part Number OL-4545-01, Rev. H0, May 2006