Cisco MGX MGX 8800 Hardware Installation Manual page 473

Cisco systems switches installation guide
Hide thumbs Also See for Cisco MGX MGX 8800:
Table of Contents

Advertisement

Chapter 5
Installing the Cisco MGX Switch or Gateway
Figure 5-54
Copper or
fiber
cabling
Connect the Console Port
The command line interface (CLI) management tool allows you to configure the switch and display the
switch status. When a switch starts up for the first time, the only CLI access available is through the
console port (CP).
Connect a VT-100 compatible terminal to the CP on the PXM-UI-S3 or PXM-UI-S3/B. Connect the
terminal to a power source and set it up using the values that are shown in
the hardware required for a CP connection.
Figure 5-55
PXM-UI-S3
back card
C
P
M
P
L
A
N
1
L
A
N
2
E
X
T
C
L
K
1
E
X
T
C
L
K
2
R
M
Releases 2 - 5.2, Part Number OL-4545-01, Rev. H0, May 2006
Routing Data Cables
Workstation Connection to the Console Port
PXM
UI-S3
Serial cable
Workstation
A
L
A
Cable manager
Cisco MGX 8800/8900 Series Hardware Installation Guide
Installing the MGX 8950 Switch
Copper or
fiber
cabling
Table
5-6.
Figure 5-55
shows
5-89

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mgx 8900 series

Table of Contents