Terex Genie GS-1330m Service And Repair Manual page 175

Hide thumbs Also See for Genie GS-1330m:
Table of Contents

Advertisement

August 2021
Full Load Calibration: Part 2
23 At the ground controls, press and hold the
Function Enable and Platform Up buttons until
the platform reaches maximum height.
24 GS-4046: Press and hold the Menu Enter
button to determine the maximum height. The
machine will lower for 1.2 seconds and then
raise in 1.2 second durations, until maximum
height is reached. When the platform reaches
the maximum height, a message will appear
on the LCD screen to release the Menu Enter
button.
All other models: When the platform reaches
maximum height, press the Enter button.
Allow the ground controls to gather data.
Note: If at any point the Menu Enter button is
released before the message appears on the LCD
screen, the calibration procedure will restart at
step 26.
25 When prompted, press and hold the Function
Enable and Platform Down buttons to lower
the platform. The platform will move down,
then automatically stop at a predetermined
point to gather data. Allow the ground controls
to gather data.
26 Continue pressing the Function Enable and
Platform Down buttons throughout the
lowering and data gathering sequence. The
machine will stop to gather data and lower
several times before the machine reaches the
stowed position. When the platform reaches
the stowed position, press the Enter button.
Note: GS-2032, GS-2646, GS-2646 XH, GS-
4046 models, continue to step 32.
Note: All other models, continue with step 30.
Part No. 1309020GT
27 When prompted, press and hold the Function
Note: If the Function Enable or Platform Up
buttons are released while the machine is
collecting data, the GCON LCD will prompt the
user to lower the platform for 5 seconds before
prompting to raise the platform to full height again.
28 When prompted, press and hold the Function
Note: If the Function Enable or Platform Down
buttons are released while the machine is
collecting data, the GCON LCD will prompt the
user to raise the platform for 5 seconds before
prompting to lower the platform to the stowed
position again.
29 When prompted, push the red Emergency
GS
-30m • 32m • 30 • 32 • 46 • 55
Service and Repair Manual
Scissor Components
Enable and Platform Up buttons until the
platform reaches full height. When the
platform reaches full height, press the enter
button.
Enable and Platform Down buttons until the
platform is fully stowed. When the platform
reaches the stowed position, press the enter
button.
Stop button in to complete the Platform
Overload Calibration procedure.
161

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents