Filling gas condensing module and heating...
!
Please note
Unsuitable fill water increases the level of
deposits and corrosion and may lead to appli-
ance damage.
Flush the heating system thoroughly before
filling.
Only use fill water of potable water quality.
Special antifreeze suitable for heating systems
can be added to the fill water. The antifreeze
manufacturer must verify its suitability.
Fill and top-up water with a water hardness in
excess of the following values must be soft-
ened, e.g. with a small softening system for
heating water.
Total permissible hardness of the fill and top-up water
Total heating output
kW
50
50 to
200
>
200 to
600
>
600
>
D
B
A
C
Fig. 60
Heating return
A
Heating flow
B
Specific system volume
< 20 l/kW
3
3.0 mol/m
(16.8 °dH)
3
2.0 mol/m
(11.2 °dH)
1.5 mol/m
3
(8.4 °dH)
< 0.02 mol/m
3
(0.11 °dH)
C
A
B
D
Commissioning, inspection, maintenance
(cont.)
20 l/kW to < 50 l/kW
3
2.0 mol/m
(11.2 °dH)
3
1.5 mol/m
(8.4 °dH)
0.02 mol/m
3
(0.11 °dH)
< 0.02 mol/m
3
(0.11 °dH)
50 l/kW
3
< 0.02 mol/m
(0.11 °dH)
3
< 0.02 mol/m
(0.11 °dH)
< 0.02 mol/m
3
(0.11 °dH)
< 0.02 mol/m
3
(0.11 °dH)
63

Advertisement

Table of Contents
loading

This manual is also suitable for:

F11tF19tF25tF32t

Table of Contents