Keyword Index - Viessmann Vitovalor PT2 Installation And Service Instructions For Contractors

Fuel cell based micro chp unit with integral gas condensing boiler and adjacent cylinder module natural gas version
Table of Contents

Advertisement

Keyword index

Keyword index
A
Air filter replacement.................................................. 83
Appliance
– Aligning................................................................... 26
– Splitting................................................................... 52
B
Bidirectional meter............................. 18, 19, 20, 21, 24
Boiler, draining......................................................... 138
– DHW side.............................................................. 139
Burner, fitting........................................................ 80, 82
Burner, removing........................................................77
Burner control unit....................................................159
– Connection plan.................................................... 159
Burner gasket.............................................................78
Burner gauze assembly............................................. 78
C
Checking
– Service message.....................................................88
Checking functions...................................................108
Combustion chamber, cleaning..................................80
Combustion controller.............................................. 154
Combustion quality, checking.....................................86
Commissioning...........................................................62
Commissioning assistant........................................... 65
Commissioning fuel cell module.................................72
Condensate drain.......................................................80
Connection error.......................................................113
Connection pressure.................................................. 69
Connections
– Electrical..................................................................42
– On gas side............................................................. 41
– On water side.......................................................... 39
Connection scheme................................................. 157
Control unit, cylinder module
– Connection plan.................................................... 160
Control unit, gas condensing module
– Connection plan.................................................... 157
Convert gas type
– Fuel cell module...................................................... 73
CO sensor replacement............................................. 83
D
Determining the increase in flow temperature..........150
DHW circulation pump connection............................. 47
DHW side, draining.................................................. 139
Diaphragm expansion vessel
– Heating circuit......................................................... 64
Dimensions...........................................................11, 12
Distilled water, filling...................................................74
Distilled water cartridge replacement......................... 83
Domestic distribution box......................... 19, 20, 21, 23
Drain lines, routing..................................................... 27
E
Electronic combustion controller.............................. 154
Electronics module M2IO
– Connection plan.................................................... 160
Energy manager.........................................................76
166
Energy meter..............................................................17
Excess export.......................................................21, 23
Excess export system................................................ 18
Extension
– EM-EA1.................................................................148
Extension kit for heating circuit with mixer............... 145
F
Fault codes
– Gas condensing module........................................115
Fault history.............................................................. 113
Fault message call-up.............................................. 113
Fault messages
– Display...................................................................113
Fault messages, calling up.......................................107
Faults
– Display...................................................................113
Filling function.................................................... 84, 149
Fill water.....................................................................63
Flue gas temperature sensor................................... 140
Flue outlet.................................................................. 40
Front panels, removing.............................................. 57
Fuel cell
– Checking............................................................... 110
– Draining...................................................................83
– Gas consumption.................................................. 110
– Heating water side draining...................................139
– Operating condition............................................... 110
– Parameters, grid monitoring.................................. 111
– Power generated................................................... 110
– Transport................................................................. 11
Fuel cell stack...................................................... 18, 24
Function descriptions............................................... 147
Function sequence.....................................................71
Fuse......................................................................... 145
Fuse protection.......................................................... 24
G
Gas supply pressure.................................................. 70
Gas train...............................................................62, 70
Gas type.....................................................................10
Generated power....................................................... 17
GS protection....................................................... 18, 24
H
Handling..................................................................... 11
Heating curve..................................................... 88, 149
Heating curve level...................................................150
Heating curve slope................................................. 150
Heating output, setting............................................... 69
Heating surfaces, cleaning.........................................80
Heating water side, filling........................................... 68
Heat-up time.............................................................153
I
Ignition........................................................................79
Ignition electrodes...................................................... 79
Inserting the SD card................................................112
Intended use................................................................ 9
Internet, connecting....................................................67

Advertisement

Table of Contents
loading

This manual is also suitable for:

F11tF19tF25tF32t

Table of Contents