UPPER MAIN HARNESS INSTALLATION (2 OF 6)
5
Route Ballast Power Cable (p/n:1-910-015-27) BEHIND the
purselock (p/n:4-035-160-01) and along duct block cover.
7
Route lamp fan (white 3p connector) leads (below
duct block) left and into the purselock on top of
the duct block.
KF-E42A10/E50A10
6
Route Ballast Sensor leads(beige connector) inside purselock, route Duct
Fan leads (black 3P connector) to the LEFT and into the purselock.
8
Push Ballast power cables BEHIND the black duct block cover.
There is a ridge on the corner formed by the cover where the
cables can be routed.
KF-E42A10/E50A10
Tool / Torque
Caution Points
Please Follow All
CAUTION
points listed. It
is important to control
VARIATION of wire
routing for minimizing
Electro Maagnetic
Interference (EMI)
66