UPPER MAIN HARNESS INSTALLATION (1 OF 6)
1
Upper Main Harness Diagram (p/n:1-910-021-65)
3
Wrap M4 wire clamp as shown to secure the upper harness to the
bottom cabinet (located over left side of Optical block).
M4 clamp p/n:2-594-861-01; 4x16mm screw p/n:2-580-640-01
CAUTION: Direction and routing of cables. Cable is seated in front
of black foam gasket with M4 clamp bent down and inwards.
KF-E42A10/E50A10
2
Dress M4 wire clamp next to split in upper harness. Keep cable tie to the
Left of the clamp. Use short 3P connector ( 4-3 on diagram) as a
reference.
4
Secure opposing side of the upper harness with M4 clamp (right of
first M4 clamp – Over right side of Optical Block).
M4 clamp p/n:2-594-861-01; 4x16mm screw p/n:2-580-640-01
CAUTION: Direction and routing of cable. Cable is seated in front of
foam gasket with M4 clamp bent down and inwards.
KF-E42A10/E50A10
Tool / Torque
Philips screwdriver
-[4x16mm screw]
- 13kg*cm +-1.0kg*cm
Caution Points
Please Follow All
CAUTION
points listed. It
is important to control
VARIATION of wire
routing for minimizing
Electro Maagnetic
Interference (EMI)
65