LIGHTNING GROUND INSTALLATION (2 OF 4)
5
Route all lightning ground wires behind support
brace, and around duct.
7
nd
2
View of installed Clamp-On Ferrite Core
KF-E42A10/E50A10
6
Install Clamp-On Ferrite core (p/n:1-543-830-011; TDK ZCAT2032-0930)
8
CAUTION: Make sure Ferrite Core is COMPLETELY CLOSED.
KF-E42A10/E50A10
Tool / Torque
Caution Points
Please Follow All
CAUTION
points listed. It
is important to control
VARIATION of wire
routing for minimizing
Electro Maagnetic
Interference (EMI)
50