B BLOCK ASSEMBLY INSTALLATION (1 OF 5)
1
Dress 15P Cable from B-Block (p/n:1-910-021-64). Dress
all cables in M4 Clamp on Bottom Cabinet.
3
Install Connector Assembly 1-910-021-68 on AGA CN8405
CAUTION: routing of the cable is LEFT/BELOW of ferrite core. Do
not cross cable over ferrite core. The routing shown is best for
EMI.
KF-E42A10/E50A10
2
Install 20x50mm himelon tape over 20P Connector Assy. On AGA board.
Himelon p/n:4-079-129-21
CAUTION: Make sure tape is installed with minimum gaps between metal
shields. Take caution to route wires BEHIND terminal shield. Edges of
Metal shield are sharp (Can cut fingers/hands).
4
Complete AGA Wire Pre-Routing.
CAUTION: Please take caution and note specific routing of each
cable. Variations in the routing shown is NG for minimizing EMI.
KF-E42A10/E50A10
Tool / Torque
Caution Points
Please Follow All
CAUTION
points listed. It
is important to control
VARIATION of wire
routing for minimizing
Electro Maagnetic
Interference (EMI)
32