PPP Over Serial
WAN Port Case
Study
Goals
Assumptions
Process
Connect the "main_office" RAS 1500, to the "branch_office" RAS
1500 using a leased line connection PPP link.
Authenticate using PAP.
Idle timeout should be 300 seconds.
Each office has a functioning RAS 1500.
Each office has a separate IP network. The main office has
192.112.226.0/C; the branch office has 192.112.227.0/C.
Use Routing Information Protocol (RIPv1).
The goals can be achieved with either a numbered IP link or an
unnumbered link between the sites. Figure 24 shows a numbered link,
and Figure 25 shows an unnumbered link.
Figure 24 Numbered PPP over Serial WAN Port Link
PPP Over Serial WAN Port Case Study
267