Juniper MX204 Hardware Manual page 29

3d universal edge router
Hide thumbs Also See for MX204:
Table of Contents

Advertisement

MX204 3D Universal Edge Router Hardware Guide
Table 16: MX204 Site Preparation Checklist (continued)
Item or Task
Calculate the power consumption and
requirements.
Rack
Select the type of rack or cabinet.
Plan rack or cabinet location, including required
space clearances.
If a rack is used, secure rack to floor and building
structure.
Cables
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.
Related
Documentation
36
For More Information
"Power Consumption for a
DC-Powered MX204 Router" on
page 50
"Power Consumption for an
AC-Powered MX204 Router" on
page 44
"MX204 Router Rack Requirements"
on page 32
"MX204 Router Cabinet
Requirements and Specifications" on
page 33
"MX204 Router Clearance
Requirements for Airflow and
Hardware Maintenance" on page 34
"MX204 Router Rack Requirements"
on page 32
"Calculating Power Budget and
Power Margin for Fiber-Optic Cables"
on page 37
MX204 Installation Summary on page 63
Tools Required to Install the MX204 Chassis in Rack on page 64
Installing the MX204 Chassis in a Rack on page 65
Performed by
Date
Copyright © 2018, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents