Processor Unit - Furuno FSS-3BB Installation Manual

Fish species and biomass sounder
Hide thumbs Also See for FSS-3BB:
Table of Contents

Advertisement

2. WIRING
2.1

Processor Unit

2.1.1
Connectors
Cable entrance
IV-8sq.
MJ-A3SPF0018-050ZC,
5 m
POWER
12/24 VDC
Ground Terminal
To ship's ground
*1
: Fabricate the cable referring to section 2.1.3.
*2
: To connect a USB device, use the lower USB port first.
Secure the USB, HDMI and LAN cables to the cable clamp with a cable tie (local sup-
ply). For the USB cables, use two cable ties to secure the cable.
Note 1: The cable clamp can be adjusted to allow larger connectors, such as USB or
HDMI, to be connected.
Secure each cable
using a cable tie.
Note 2: The maximum cable length for USB2.0 and USB3.0 is as follows. To extend
the USB cable, the optional DVI/USB repeater is required. If you extend the USB cable
without the DVI/USB repeater, the USB device operation is not guaranteed.
• USB2.0: Max. 5 m
2-2
*2
USB1
USB3
USB cable
Not used
USB4
*2
USB2
USB3.0
• USB3.0: Max. 3 m
USB3.0
*2
USB2.0
HDMI1 To Monitor Unit (Main)
HDMI2 To Monitor Unit (Sub)
HDMI cable or
HDMI-TO-DVI-L cable, 5.3/10.3 m
USB cable
*2
USB2.0
NETWORK1
To Transceiver Unit
Note: Use NETWORK1 port
for connection with the
transceiver unit.
Unfasten the indicated screws to
adjust the cable clamp. Refasten the
screws to secure the cable clamp after
adjustment.
Not used
*1
DTIC5E350SLABVCVxxT
Max 100 m
,

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents