Furuno FSS-3BB Installation Manual page 18

Fish species and biomass sounder
Hide thumbs Also See for FSS-3BB:
Table of Contents

Advertisement

1. MOUNTING
Mounting considerations
• Locate the unit away from heat sources.
• Locate the unit away from places subject to water splash and rain.
• Select a mounting location considering the length of the cables to be connected to
the unit.
• Select a location where shock and vibration are minimal.
• Referring to the outline drawings at the back of this manual, allow sufficient space
for maintenance and service.
• A magnetic compass will be affected if the unit is placed too close to the magnetic
compass. Observe the compass safe distances at the front of this manual to prevent
interference to a magnetic compass.
• For bulkhead installations, secure the unit so that the cable entrance faces down-
ward.
• The maximum cable length for the video signal cable is as follows:
• HDMI-TO-DVI-L cable between processor unit and transmitter unit: 5.3 m
• DVI-D/D S-LINK cable between receiver unit to monitor unit: 5 m
Mounting procedure
1. Drill four pilot holes in the mounting location for mounting screws (φ5×20, local
supply), referring to the outline drawing at the back of this manual.
2. Screw the four self-tapping screws into the pilot holes. Leave 5 mm of thread vis-
ible.
3. Hang the unit onto the screws fastened at step 2.
4. Fasten all screws tightly to secure the unit in place.
Self-tapping screw
(ø5×20, 4 pcs)
1-10
Detailed view
Hang on the unit onto the
self-tapping screws.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents