Electrical Requirements - Graco DC12 Operation & Setup

High-volume metering system
Table of Contents

Advertisement

Setup
Grounding
The equipment must be grounded. Grounding
reduces the risk of static and electric shock by
providing an escape wire for the electrical current
due to static build up or in the event of a short
circuit.
Solvent pails used when flushing: Use only
conductive metal pails, placed on a grounded
surface. Do not place pail on a nonconductive
surface, such as paper or cardboard, which
interrupts grounding continuity.

Electrical Requirements

Electrical Requirements only apply to
machines equipped with Performance Monitor Plus
control package. See Configurator code C.
The DC12 with Performance Monitor Plus is
available in 2 voltages:
1. 120V / 1PH / 50-60HZ
2. 230V / 1PH / 50-60 HZ
Max Current 6 Amps
Machines are wired at the factory according to the
configuration.
1. 120V systems are provided with a 20ft (6M)
cord and 3 prong North American connector.
2. 230V systems are provided with a 20ft (6M)
cord. Connections will be marked L1, L2,
and GND.
Have a trained electrician install and inspect power
connection per local code.
36
312767B