Setup; Unpack; Location Requirements; Install System - Graco Therm-O-Flow 200 Instructions-Parts List Manual

Hide thumbs Also See for Therm-O-Flow 200:
Table of Contents

Advertisement

Setup

1. Unpack the Ram
2. Locate and Install the Ram
3. Mechanical Setup
4. Connect hoses to Electrical Control Panel
5. Connect Electrical Control Panel to power source
6. Ground system
7. Select ADM settings

Unpack

1. Inspect the shipping box carefully for damage.
Contact the carrier promptly if there is damage.
2. Open the box and inspect the contents carefully.
There should not be any loose or damaged parts in
the box.
3. Compare the packing slip against all items in the
box. Repost any shortages or other inspection
problems immediately.
4. Remove the unit from the skid and place it in the
desired location. See Location Requirements.

Location Requirements

1. Make sure there is sufficient overhead clearance for
the Heated Pump and Ram when the Ram is in the
fully raised position (approximately 110 in. (280
cm)).
2. If you are installing a vent hood, make sure there is
sufficient horizontal clearance for it. Locate the
Ram near a connection to the factory ventilation
system.
3. Make sure the air regulators for the Heated Pump
and Ram are fully accessible, with room to stand
334130W
directly in front of the Pneumatic Control Panel and
the Electrical Control Panel.
4. When locating the system, do not install closer than
36 in. (914 mm) to vertical surfaces.
5. Make sure there is easy access to an appropriate
electrical power source. The National Electrical
Code requires 3 ft (0.9 m) of open space in front of
the electrical panel. Comply with all local codes and
regulations.
6. For hydraulic rams, locate the hydraulic power
supply in an area that has:
-
easy access for servicing and adjusting the
hydraulic pressure on the supply unit
-
sufficient clearance for the hydraulic lines that
attach to the Pump
-
easy access to read the hydraulic fluid level
gauge

Install System

Refer to Dimensions, page 115 for mounting and
clearance dimensions.
Follow all Location Requirements, page 15, when
selecting a location for the Ram.
1. Apply 50 psi download pressure to Ram.
2. Wrap the bar with the lifting sling.
3. Lift the system off the pallet using a crane or a
forklift and place in desired location.
4. Level the base of the Ram, using metal shims.
5. Bolt the Ram to the floor, using anchors that are
long enough to prevent the unit from tipping.

Install Hydraulic Power Supply

Setup
15

Advertisement

Table of Contents
loading

Table of Contents