Daikin VRV Plus Series General Information Manual page 54

R-407c
Hide thumbs Also See for VRV Plus Series:
Table of Contents

Advertisement

Si33-003.book Page 50 Monday, June 25, 2001 9:06 AM
Installation
3.2.11 Duct Work (Indoor)
Taking Account of
a) Canvas joints must be used between the main unit and the air suction and discharge ducts. These
Noise and Vibration
b) The speed of the airflow should be taken into account when choosing air suction and distribution grills in
1. The air discharge duct must be thermally insulated.
2. The canvas duct on the inlet side must be set in a metal framework.
3. The air suction and distribution grills should be positioned to take into account the possibility of short
4. Static pressure should be checked to ensure that the airflow is within the specified range.
5. The air filter must be easily detachable.
50
Operational steps
Install indoor unit
Connect ducts
fittings are designed to inhibit secondary noise resulting from the transmission of vibrations and
operating noise from the main unit to the ducts or to the rest of the building.
order to keep wind noise to minimum.
Important points
circuits.
Fit inlets and outlets
(V1040)
: http://splitoff.ru/tehn-doc.html
SiE33-003
General Information

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents