Daikin VRV Plus Series General Information Manual page 41

R-407c
Hide thumbs Also See for VRV Plus Series:
Table of Contents

Advertisement

Si33-003.book Page 37 Monday, June 25, 2001 9:06 AM
SiE33-003
Grouped Drain
1. It is standard work practice to make connections to the main pipe from above. The pipe down from the
Piping
2. The pipework should be kept as short as possible and the number of indoor units per group kept to a
Use of an Auxiliary
If a drain pan made of polystyrene foam is used then an auxiliary drain hose (flexible) is also essential. A
Drain Hose
flexible drain hose permits the drain socket and drain pipe to be connected without difficulty and prevents
(Flexible)
any undue strain being placed on the drain pan.
Important points
1. The drain pipe should be at least equal in size to that of the indoor unit.
2. The drain pipe is thermally insulated to prevent the formation of condensation inside the pipe.
3. The drain up mechanism should be fitted before the indoor unit is installed and when the electricity has
4. All connections should be secure. (Special care is needed with PVC pipe)
General Information
combination should be as large as possible.
minimum.
been connected some water should be added to the drain pan and the drain pump checked to see that
it is functioning correctly.
The use of a colored adhesive with PVC pipes will help you to remember to connect them up.)
: http://splitoff.ru/tehn-doc.html
Installation
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents