Daikin VRV Plus Series General Information Manual page 50

R-407c
Hide thumbs Also See for VRV Plus Series:
Table of Contents

Advertisement

Si33-003.book Page 46 Monday, June 25, 2001 9:06 AM
Installation
2. After piping, check to make sure draining flows smoothly.
WHEN ELECTRIC WIRING WORK IS FINISHED
Check drainage flow during COOL running, explained under "TEST OPERATION".
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
Remove the electric parts box lid, connect a power supply and remote control to the terminals.
Next, press the inspection/test operation button "
test operation mode. Press the operation mode selector button "
OPERATION "
start up. Check that the water has drained from the unit. Press "
46
Open the water inlet lid, add approximately 1000 cc of water gradually and check drainage flow.
". Then, press the ON/OFF button "
" on the remote control. The unit will engage the
" until selecting FAN
". The indoor unit fan and drain pump will
" to go back to the first mode.
: http://splitoff.ru/tehn-doc.html
SiE33-003
General Information

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents