Daikin VRV Plus Series General Information Manual page 48

R-407c
Hide thumbs Also See for VRV Plus Series:
Table of Contents

Advertisement

Si33-003.book Page 44 Monday, June 25, 2001 9:06 AM
Installation
2. After piping, check to make sure draining flows smoothly.
If construction work for interconnecting piping is complete:
Using a plastic container for water filling, etc., gradually inject about 1,000 cc of water into the drain pan
through the inspection hatch.
Note:
To drain water from the drain pan, use the drainage port for maintenance.
WHEN ELECTRIC WIRING WORK IS FINISHED
Check drainage flow during COOL running, explained under "TEST OPERATION".
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
Remove the electric parts box lid, connect a power supply and remote control to the terminals.
Next, press the inspection/test operation button "
test operation mode. Press the operation mode selector button "
OPERATION "
start up. Check that the water has drained from the unit. Press "
44
" on the remote control. The unit will engage the
". Then, press the ON/OFF button "
: http://splitoff.ru/tehn-doc.html
SiE33-003
" until selecting FAN
". The indoor unit fan and drain pump will
" to go back to the first mode.
General Information

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents