Unpacking And Placing The Unit - Daikin VRV Plus Series General Information Manual

R-407c
Hide thumbs Also See for VRV Plus Series:
Table of Contents

Advertisement

Si33-003.book Page 135 Monday, June 25, 2001 9:06 AM
SiE33-003

5. Unpacking and Placing the Unit

5.1

Unpacking and Placing the Unit

1. Remove the wooden crafte from the unit.
2. Remove the four screws fixing the unit to the pallet.
3. The unit must be installed on a solid longitudinal foundation (steelbeam frame or concrete) as indicated
Note:
Maximum height of the foundation is 150mm.
4. Lift the unit from the pallet and place it on its installation position.
5. Fasten the unit in place using four anchor bolts M12.
6. Remove the upper and lower service plate.
7. When closing the service panels take care that the tightening torque does not exceed 4.1 Nm.
8. Remove the yellow shipping stays from the compressor support as shown in the figure (2 stays per
Caution
1. Prepare a water drainage channel around the foundation to drain waste water from around the unit.
2. If the unit is to be installed on a roof, check the strength of the roof and its drainage facilities first.
3. If the unit is to be installed on a frame, install the waterproofing board within a distance of 150mm under
Refer "Installation of Outdoor Unit" page 51 for more foundation detail.
Installation Manual
in figure 5.
1280
1280
1000
1000
2568
1280
2290
1000
Bad Example
1
1
2
single compressor). Tighten the installation bolts firmly again afterwards.
the unit in order to prevent infiltration of water coming from under the unit.
Unpacking and Placing the Unit
1. Fundamental bolt position (φ15 holes ... 8 places)
1
2
Fig. 5
(V0853)
1.
No!
2. Do not use stands to support the corners.
Fig. 4
(V0852)
(V0898)
: http://splitoff.ru/tehn-doc.html
135

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents