Daikin VRV Plus Series General Information Manual page 46

R-407c
Hide thumbs Also See for VRV Plus Series:
Table of Contents

Advertisement

Si33-003.book Page 42 Monday, June 25, 2001 9:06 AM
Installation
2. After piping work is finished, check drainage flows smoothly.
WHEN ELECTRIC WIRING WORK IS FINISHED
Check drainage flow during COOL running, explained under "TEST OPERATION".
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
Remove the electric parts box lid, connect a power supply and remote control to the terminals.
Next, press the inspection/test operation button "
test operation mode. Press the operation mode selector button "
OPERATION "
start up. Check that the water has drained from the unit. Press "
[Method of adding water]
FXYKP-ceiling
1. Install the drain pipes.
mounted corner
cassette
42
Open the water inlet lid, add approximately 600 cc of water slowly and check drainage flow.
". Then, press the ON/OFF button "
Note that the fan also starts rotating.
Keep piping as short as possible and slope it downwards so that air may not remained trapped inside
the pipe.
Keep pie size equal to or greater than that of the connecting pipe (Vinyl pipe of 25 mm nominal diam.
and 32 mm outer diam.).
Use the attached drain hose and clamp. Tighten the clamp firmly.
Insulate the clamp with the attached sealing pad.
" on the remote control. The unit will engage the
" until selecting FAN
". The indoor unit fan and drain pump will
" to go back to the first mode.
Switch box
cover (1)
Switch box
cover (2)
P1 P2 F1 F2 T1 T2
Terminal board for
remote control (6P)
Lead cable for remote control
: http://splitoff.ru/tehn-doc.html
SiE33-003
Power supply
terminal board (2P)
L
N
Power supply
3PA60996-10L
General Information

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents