Fluke 9132A Service Manual page 44

Table of Contents

Advertisement

Open the Pod self test drawer (if necessary, slide
4,
sideways to allow enough cable length
completely).
Remove the regular Personality Module,
5.
Personality Module.
6.
Make sure
Module(s).
7.
Plug the Extender Board into
main board
bey extender
socket.
$100 SERIES
MAINFRAME
Connect the 9132A Pod cable to the power
8.
Tape down the power interlock switch
9.
the
9132A
Running
Before running the 9132A Service Test, you must load the test software
onto the Mainframe hard disk (or EDISK), or
userdisk (see the 9100 Series Technical User's Manual
Once the test software
Mainframe keypad. Enter 9132A
name. Press ENTER/YES.
The Service Test program menu (shown
monitor screen. To select
on the Mainframe keypad
ENTER/YES, or select the number of the test
automatically runs the Sync Module Test).
ROMs
plugged into
no
are
the
shown
in
Figure
(as
and plug
the
board,
B000A-68000
Connecting the Test
Figure 3-7.
Service Test
loaded onto the system, press EXEC on the
is
as
of the
any
highlight
to
the drawer to open
for
replace it with the Test
and
ZIF socket
the
the rear of the Pod
test connector
on
Install the test jumper
3-7).
UUT cable from the 68000 Pod into
TEST
ADAPTER CARD
9132A UUT
Equipment
supply.
the 9132A main board.
on
the floppy disk
set up
details).
for
TST
the UUT name
and
3-8) is
in
Figure
either use
the up
tests,
test to be run and press
the
to be
run
9132A Service
main board
the
the ROM
on
(J4) on
the
POWER
SUPPLY
9010 or
{or
9100)
3-19.
the
as
the program
as
displayed on the
or down arrows
pressing "4"
(i.e.,
3-13

Advertisement

Table of Contents
loading

Table of Contents