Fluke 9132A Service Manual page 38

Table of Contents

Advertisement

Closing the Pod Case
After installing or changing the internal or external modules
the back panel
Sync Module cables are inserted properly into the
panel. Tighten the thumbscrews
CONNECTING THE POD TO THE MAINFRAME
Before performing a Pod Self Test or using the Pod to troubleshoot a UUT,
connect the Pod to
Check that the Mainframe
1.
Connect
2.
location shown in Figure
collar,
Figure 3-5.
USING POD SELF TEST
The built-in Pod self test
of the Pod's circuitry may
further isolate
test failure code
circuit block.
standard Personality Module (such as the 80386,
A
68020, etc.) must
performing self
when the Test
into
back
Pod
the
case.
pressing them in
by
the
Mainframe as follows:
OFF.
is
1
Pods
round shielded cable to the Mainframe at the
the
Secure the connector using the sliding
3-5.
Connection
the
Interface Pod
of
can be used as
be
failing.
cause of the failure. Perform
the
Table
shown in
(as
NOTE
installed
be
Pod self test does not function
test.
Personality Module is installed.
in
Make sure the ROM Module
slot on
the top of the
and
turning clockwise.
to the
Mainframe
a guide to determine which section
The 9132A Service Test
self test and use
the
to isolate the probable failing
3-2)
Pod before
in
the
9132A Service
3-14.
the Pod, push
and
3-15.
3-16.
then
can
self
the
3-7

Advertisement

Table of Contents
loading

Table of Contents