Nortel 1000E PRI Installation And Commissioning Manual page 159

Hide thumbs Also See for 1000E PRI:
Table of Contents

Advertisement

.
Index
A
administrative users 116
automatic backups 141
B
B-channels 46
backups
automatic 141–142
manual 141, 143
restore 146
status 145
C
cables 48
CE-MUX 30
CE-MUX clock controllers 93
clock controller 105
clock controller maintenance 126
clock controllers 93
configuration
large line size systems 29
small line size systems 29
connectors 48
for the MGC 48
D
D-channel 127
D-channel configuration 41, 87, 91
D-channels 46
daughterboards
DCH 41
DCHI 41
installing 56
removing 57
DCH daughterboards 41
DCHI 132
Media Gateway 1000E PRI Gateway Installation and Commissioning
Nortel Communication Server 1000
NN43041-311 04.01 4 June 2010
Copyright © 2007-2010 Nortel Networks. All Rights Reserved.
DCHI daughterboards 41
downloading reports 137
DPNSS
loop configuration 85
DPNSS spans
enabling through software 105
DPNSS trunk routes 97
DPNSS trunks 100
DPNSS/DASS 132
DSP daughterboard
configuring Voice Gateway Channels 80
installing 53
Voice Gateway Channel 76
dual-homing 64
E
E1/T1 card 36, 48
basic settings 119
connectors and cables 48
installation 60
ISDN 121
LEDs 38
remote access 112
system settings 114
ELAN subnet connections 67
error reports 137
F
FTP 113
I
installing daughterboards 56
inventory
printing IDs for E1/T1 cards 135
printing IDS for MGP cards 135
IPE card slots 41
159

Advertisement

Table of Contents
loading

Table of Contents