Verify the network connections. For detailed information, see
"Verify network connections" (page
Power up the system
When you first install and power up the PRI Gateway, the E1/T1 banner
appears on the window. See
108)
which displays an example of three enabled spans. After the first
power-up, the banner parameters are empty.
The window displays the following information:
logo
customer-defined card name
status of the E1/T1 spans
IP address
The window displays one line for each E1/T1 span.
The Protocol column displays:
E1
T1
not defined
The Usage column displays what hardware is used for D-channel:
DDCH
DCHI
DCHI-SW
BCH (for BCH, no DCH hardware is needed)
The ClockReference column displays which span is the primary and
secondary reference clock. The Clock Controller track on field displays
on which span it is synchronized:
primary
secondary
free run
The Status displays the span status: either enabled or disabled.
Nortel Communication Server 1000
Media Gateway 1000E PRI Gateway Installation and Commissioning
NN43041-311 04.01 4 June 2010
Copyright © 2007-2010 Nortel Networks. All Rights Reserved.
Initial configuration of the E1/T1 card 107
110).