N) Operation Via Communication And Its Settings - Mitsubishi Electric FR-A820-00046 Instruction Manual

Fr-a800 series
Hide thumbs Also See for FR-A820-00046:
Table of Contents

Advertisement

Parameters
5.15

(N) Operation via communication and its settings

Purpose
To start operation via
communication
To operate via communication from
PU connector
To operate via communication from
RS-485 terminals
Communication operation through
the CC-Link IE Field Network
(FR-A800-GF)
To communicate via Ethernet
connector (FR-A800-E)
Operation via communication
using the inverter-to-inverter link
function (FR-A800-E)
To communicate using USB
(FR Configurator2)
To connect a GOT
FR-A800
(N) Operation via communication and its settings
Parameter to set
Initial setting of operation via
communication
Initial setting of computer link
communication (PU connector)
Initial setting of computer link
communication (RS-485
terminals)
Modbus® RTU communication
specification
CC-Link IE Field Network
Initial setting of Ethernet
communication
CC-Link IE Field Network Basic
Inverter-to-inverter link
function
USB communication
GOT automatic recognition
Pr. 549, Pr. 342,
P.N000, P.N001,
Pr. 349,
P.N010 to P.N014
Pr. 500 to Pr. 502,
Pr. 779
P.N020 to P.N028
Pr. 117 to Pr. 124
Pr. 331 to Pr. 337,
P.N030 to P.N038
Pr. 341
P.N002, P.N030,
Pr. 539, Pr. 331,
P.N031, P.N034,
Pr. 332, Pr. 334,
P.N080,
Pr. 343,
P.N100, P.N110,
Pr. 434, Pr. 435,
P.N111
Pr. 541
P.N600 to P.N603,
P.N610 to P.N613,
Pr. 1424 to
P.N630 to P.N632,
Pr. 1429,
P.N641 to P.N644,
Pr. 1431, Pr. 1432,
P.N650, P.N651,
Pr. 1434 to
P.N660 to P.N666,
Pr. 1455
P.N670 to P.N675
P.N100, P.N103,
Pr. 541, Pr. 544,
P.D400, P.H700
Pr. 804, Pr. 810
P.N681, P.N682
Pr. 1124, Pr. 1125
P.N040, P.N041
Pr. 547, Pr. 548
P.N020, P.N030
Pr.117, Pr.331
Refer
to
page
5-626
5-635
5-655
5-673
5-675
5-802
5-832
5-635
5-685
5 - 619

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents