Verifying the Installation Site

_________________________Caution____________________________
Review your system warranty. It may require that a Digital service
representative install your system to prevent damage to equipment or software.
____________________________________________________________

Preinstallation Considerations

Before you install the rackmount server system, ensure:
All cables you plan to connect to the rackmount system are in place and clearly
labeled:
Terminal data cables
Telephone cables
Network cables
You meet the specifications and environmental conditions listed in the system owner's
guide. For more information about planning and preparing the installation site for a
computer network for free-standing system, refer to the Site Environmental
Preparation Guide, EK-CSEPG-MA (not shipped with the system.)
The system is located in an area (see Figure 2-1) that gives 61 cm (24 in) clearance
from the rear of the cabinet and 91 cm (36 in) from the front of the cabinet for
ventilation and servicing.